Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
      • Public Notices
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
      • Note On Aarey
      • MMRC Ad
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
      • O & M
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • eTender - CPPP
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
  • Vigilance
    • Chief Vigilance Officer
    • About MMRC Vigilance
    • Functions of the CVO
    • Vigilance Complaints
    • Notice
    • Contact Us
    • Vigilance Awareness Week
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
    • RISK ASSESSMENT & MANAGEMENT POLICY
    • WHISTLE BLOWER POLICY
    • CORPORATE SOCIAL RESPONSIBILITY POLICY
Flash News
MMRC

Flash News

MMRC E-Calendar 2025
Design, Engineering, Supply, Installation, Testing, Commissioning and Comprehensive Operation & Maintenance of Roof Top Solar PV Project and associated support structure works on RESCO Model for a Period of 25 Years on Aarey Station & Depot Buildings of Mumbai Metro Line -3 (MML-3) Project.
MMRC extends service hours for election day
Implementation of Multi Modal Integration Facilities at Six Underground Metro Stations viz. BKC, Bandra Colony, Santacruz, Chatrapati Shivaji Maharaj Domestic Airport (CSIA T1), Sahar Road & Chatrapati Shivaji Maharaj International Airport (CSIA T2) of Mumbai Metro Line ‐ 3
Implementation of Multi Modal Integration Facilities at Six Underground Metro Stations viz. BKC, Bandra Colony, Santacruz, CSIA T1, Sahar Road & CSIA T2 of Mumbai Metro Line-3 project
Implementation of Multi Modal Integration Facilities at Six Underground Metro Stations viz. BKC, Bandra Colony, Santacruz, Chatrapati Shivaji Maharaj Domestic Airport (CSIA T1), Sahar Road & Chatrapati Shivaji Maharaj International Airport (CSIA T2) of Mumbai Metro Line ‐ 3
List of NOC's issued till 30.09.2024
Property Development on Plot bearing CTS No 1987, 1988 at Nariman Point, A Ward, Mumbai (Maharashtra, India) on Long-Term Lease Basis
Invitation to Roadshow for Property Development on plot bearing CTS No. 1987, 1988 at Nariman Point, A Ward, Mumbai (Maharashtra, India) on Long-term Lease Basis
Supplying & fixing precast SFRC heavy duty slab for inspection pathways in Aarey colony car depot of Mumbai Metro Line ‐3 project
  1. Home
  2. Project
  3. Benefits of Metro Line 3

Benefits of Metro Line 3

MMRC
  • Travel with comfort

    Today suburban trains are overcrowded, carrying 5000 passengers against design capacity of 1750. Metro 3 is expected to reduce the load by nearly 15%. Since the entire train will be air-conditioned, commuters will be saved from noise/dust pollution and will be able travel with better comfort.
  • Connecting ‘Unconnected Areas’

    MML-3 would be running along Colaba-Bandra-SEEPZ corridor connecting Mumbai’s key financial hubs such as Nariman Point, Bandra-Kurla-Complex, Fort, Worli, Lower Parel, Goregaon, etc. The metro will provide for the first time connectivity to airport, Nariman Point, Cuffe Parade, Kalbadevi, Worli, BKC, Airport, SEEPZ and MIDC. Besides, two important heritage stations of Mumbai i.e. CSTM and Churchgate will also get joined through MML-3 alignment.
  • Revisiting History

    Colaba station once commissioned in 1873 was subsequently closed in the year 1930. MML-3 project will bring Colaba back on the rail map after 85 years.
  • Inter-change facilities

    MML-3 would facilitate change over to the existing suburban trains at Churchgate, CSTM, Mumbai Central and Mahalakshmi. The existing suburban train facility would go hand-in-hand with the MML-3 to take the train services closer to the city areas that are not connected by suburban rail network.
  • Decongestion of the Roads

    Many a traffic jams would be avoided and significant waiting time would be saved with Mumbai Metro Line-3. Once implemented, MML-3 would reduce traffic on the corridor by about 35% or by 4.5 lakh vehicles leading to decongestion of roads.
  • Reduction in Travel time

    The present travel time of 100 minutes from Cuffe Parade to Airport will come down to only 50 minutes due to MML-3.
  • Comfort and Security during travel

    On account of provision of escalators/elevators, secured platforms, closed doors of train services, CCTV cover, there will be enhanced safety and comfort level for Senior citizens, ladies, patients etc. There will be entry from either side of roads avoiding FOBs/road crossing. Platform screen door will ensure safety of passengers and eliminate chances of accidents while alighting/boarding.
  • Minimal Cost Maximum Convenience

    MML-3 aims to provide the travelers convenient and comfortable journey with minimal cost being incurred. Commuters would travel by the air conditioned coaches of MML-3; spend no waiting time in the city traffic and would experience the facilities offered by the modern mass transit rail system at an affordable cost.
  • Environmental benefits

    There is expected to be reduction in air pollution, and improvement in air quality. MML-3 is committed to preserve the environment. As commuters would start to prefer the comforts of metro over other conventional transport options, there would be significant drop in air and noise pollution which are outcomes of burgeoning population in cities such as Mumbai.
  • Green & efficient transport

    Trains of MML-3 will have special feature of 40% regenerative energy generated during braking for captive use. Likely emission’s reduction on implementation of project are expected to be 1 lakh ton CO2 emissions per annum at the beginning.
  • Saving in fossil fuel

    On account of reduction in approx. 4.5 lakhs vehicles on road per day, there will be saving of approx. 2.5 lakhs liters of fuel per day i.e. about Rs. 550 cr. per year.
  • Economic Benefits

    MML-3 would be uniquely positioned to attract more business investments and is also expected to result in employment generation during and after construction.
MMRC

Recent News

mmrc
Mumbai 2025 : A city reborn
+31 Dec 2024
Mumbai's big infra leap
+31 Dec 2024
वांद्रे स्थानकातून मेट्रो स्थानक-बीकेसी बससेवा सुरू
+19 Dec 2024
दोन हजारांहून अधिक झाडांचे 'जिओ टॅगिंग' पूर्ण
+13 Dec 2024
आरे ते बीकेसीदरम्यान मुंबईच्या पोटातून सुसाट प्रवास !
+3 Dec 2024
जपानच्या उच्चाधिकाऱ्यांची बीकेसी मेट्रो स्थानकाला भेट
+02 Sep 2024
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

Maintained by Best IT Company in Ludhiana

  • mmrc
  • mmrc
  • mmrc
  • mmrc
Top