Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
      • Public Notices
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
      • Note On Aarey
      • MMRC Ad
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
      • O & M
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • eTender - CPPP
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
  • Vigilance
    • Chief Vigilance Officer
    • About MMRC Vigilance
    • Functions of the CVO
    • Vigilance Complaints
    • Notice
    • Contact Us
    • Vigilance Awareness Week
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
    • RISK ASSESSMENT & MANAGEMENT POLICY
    • WHISTLE BLOWER POLICY
    • CORPORATE SOCIAL RESPONSIBILITY POLICY
Flash News
MMRC

Flash News

MMRC E-Calendar 2025
Design, Engineering, Supply, Installation, Testing, Commissioning and Comprehensive Operation & Maintenance of Roof Top Solar PV Project and associated support structure works on RESCO Model for a Period of 25 Years on Aarey Station & Depot Buildings of Mumbai Metro Line -3 (MML-3) Project.
MMRC extends service hours for election day
Implementation of Multi Modal Integration Facilities at Six Underground Metro Stations viz. BKC, Bandra Colony, Santacruz, Chatrapati Shivaji Maharaj Domestic Airport (CSIA T1), Sahar Road & Chatrapati Shivaji Maharaj International Airport (CSIA T2) of Mumbai Metro Line ‐ 3
Implementation of Multi Modal Integration Facilities at Six Underground Metro Stations viz. BKC, Bandra Colony, Santacruz, CSIA T1, Sahar Road & CSIA T2 of Mumbai Metro Line-3 project
Implementation of Multi Modal Integration Facilities at Six Underground Metro Stations viz. BKC, Bandra Colony, Santacruz, Chatrapati Shivaji Maharaj Domestic Airport (CSIA T1), Sahar Road & Chatrapati Shivaji Maharaj International Airport (CSIA T2) of Mumbai Metro Line ‐ 3
List of NOC's issued till 30.09.2024
Property Development on Plot bearing CTS No 1987, 1988 at Nariman Point, A Ward, Mumbai (Maharashtra, India) on Long-Term Lease Basis
Invitation to Roadshow for Property Development on plot bearing CTS No. 1987, 1988 at Nariman Point, A Ward, Mumbai (Maharashtra, India) on Long-term Lease Basis
Supplying & fixing precast SFRC heavy duty slab for inspection pathways in Aarey colony car depot of Mumbai Metro Line ‐3 project
  1. Home
  2. Package
  3. Weekly progress report for package-1
mmrc icon

Weekly progress report for package-1

MMRC

Updated as on: 31st May 2022

Sr. No

Nature of Work

Status

1

Barricading

Handed over areas barricaded

2

Rehabilitation & Resettlement

Vidhan Bhavan Station:   Alternate eatery (Kutumbsakhi) has been occupied at new location.

Hutatma Chowk: Container placed at alternate location for Police Chowky. Electricity & water connection and signing of MoU awaited for shifting.

3

Traffic Diversion & Decking

Phase-1 Traffic Diversions implemented at all station locations

Cuffe Parade- Deck at service lane open to traffic

Vidhan Bhavan- Both decks at Free Press Journal Road open to traffic

Churchgate- Straight Deck and cross deck open to traffic.

Hutatma Chowk- Straight Deck open to traffic

Mid Shaft- Approval Awaited

4

Geo-technical investigation

Completed for all stations and alignment

5

Tree Cutting/transplantation

Cuffe Parade Station -

Scope:      (To be transplanted/to be cut)= 123 / 196

Completed:  ( transplanted/ cut )     = 120 / 190

Vidhan Bhavan Station - 

Scope:     (To be transplanted/to be cut)= 94 / 116

Completed: ( transplanted/ cut )     = 67/92

(All cutting/ transplantation completed as 23 trees are being saved)

Church Gate Station

Scope:      (To be transplanted/to be cut)= 47 /51

Completed:  ( transplanted/ cut )     =  40 / 38

(All cutting/ transplantation completed as 51 trees are being saved)

Hutatma Chowk Station

Scope:      (To be transplanted/to be cut)= 76 / 45

Completed:  ( transplanted/ cut )     =  44 / 43

(All cutting/ transplantation completed as 35 are being saved)

Mid Shaft

Scope:      (To be transplanted/to be  cut)= 03 / 05

Completed:  ( Transplanted/ cut )     =  02/ 03

6

Building condition Survey

100% completed

 

7

Tunneling Progress

TBM Ring Building(rmtr):

TBM1: Total completed: 2,926.5 Scope: 2,926.5(4 Breakthrough Over)

TBM2: Total completed: 2,939.3 Scope: 2,939.3 (4 Breakthrough Over)

First Stage Concrete:

TBM1: Total completed:2,910.4 Scope: 2,910.4(Started on 06/01/21 in SCP to SVB Upline, started on 05/02/21 in SVB to SCG Upline, started on 19/08/21 in SCG to SHC Upline, Started on 06/11/21 in SHC to CST Upline)

 

TBM2: Total completed: 2,919 Scope: 2939.3 (Started on 02/12/20 at SVB to SCG Downline; Started on 27/03/21 in SCP to SVB Downline, Started on 30/07/21 in SCG to SHC Downline)

 

NATM 1: Total completed: 199.12 Scope: 199.12 (Started on 03/04/21 at SCP NATM 1 Upline)

NATM 2: Total completed: 200.2 Scope: 200.2 (Started on 30/04/21 at SCP NATM 2 Downline)

8

Segment Production Progress

100% Complete (4,166 nos)

9

Secant Piling Progress

Cuffe Parade Station - Total completed -1,371; Scope –1,371(Only Station Box); Entry Exit: 347 out of 347 completed; Vent Shaft: 26 out of 26 completed.

Vidhan Bhavan Station - Total completed -1,897; Scope – 1,897 (Station Box Piling completed);
Ancillary Building – Total Completed – 77; Scope – 77

Church Gate Station - Total completed -1,406; Scope – 1,406
 Ancillary Building – Total Completed –185; Scope – 185

Hutatma Chowk Station - Total completed – 1,796; Scope – 1,796; Utility Gallery: 97 out of 160 completed.

Mid Shaft - Total completed – 172; Scope – 172 (Secant Piles)

                      Total completed – 50; Scope – 50 (ISMB Soldier Piles)

10

Excavation
(Station Box + Entry Corridors along with Column Drop, Sump, Haunch, Earthmat and Berm Deductions)

Cuffe Parade Station:  305265 cum. out of 3,06,750 cum.

Vidhan Bhavan Station:  217189.01 cum. out of 2,17,474 cum.

 

Churchgate Station:  207831.37 cum. out of 2,13,592 cum.

 

Hutatma Chowk Station:  178271.84 cum. out of 1,81,998 cum.

 

Mid Shaft: 13,724 cum. out of 13,724 cum.

11

Permanent Works

Permanent Base Slab:

  1. 9,875 sqmtr completed out of 9,875 sqmtr at Cuffe Parade
  2. 5,775 sqmtr completed out of 5,775 sqmtr at Vidhan Bhavan
  3. 6,321 sqmtr completed out of 6,321 sqmtr at Church Gate
  4. 4,641 sqmtr completed out of 4,641 sqmtr at Hutatma Chowk

Concourse Slab:

  1. 9,106 sqmtr completed out of 9,234 sqmtr at Cuffe Parade
  2. 5,287 sqmtr completed out of 5,318 sqmtr at Vidhan Bhavan (100% Completed, Only Temporary Openings Left)
  3. 5,789 sqmtr completed out of 5,915 sqmtr at Churchgate
  4. 4,001 sqmtr completed out of 4,251 sqmtr at Hutatma Chowk

 

 

Mezzanine/ Other Slab:

  1. 9,091 sqmtr completed out of 10,581 sqmtr at Cuffe Parade (Car Park Slab above concourse)
  2. 5,193 sqmtr completed out of 5,318 sqmtr at Vidhan Bhavan (100% Completed, Only Temporary Openings Left)
  3. 3,983 sqmtr completed out of 4,251 sqmtr at Hutatma Chowk

 

Roof Slab:

  1. 9,205 sqmtr completed out of 9234 sqmtr at Cuffe Parade
  2. 3,627 sqmtr completed out of 3752 sqmtr at Vidhan Bhavan (100% Completed, Only Temporary Openings Left)
  3. 5,804 sqmtr completed out of 5915 sqmtr at Churchgate
  4. 4,106 sqmtr completed out of 4251 sqmtr at Hutatma Chowk

 

Platform Slab:

  1. 3752 sqmtr completed out of 3752 sqmtr at Cuffe Parade
  2. 2,803 sqmtr completed out of 2,885 sqmtr at Vidhan Bhavan
  3. 2,972 sqmtr completed out of 3,250 sqmtr at Church Gate

12

NATM Tunnel (Heading)

Upline: Total Completed: 199.12m Scope: 199.12m

Downline: Total Completed: 200.20m Scope: 200.20m

SHC NATM PF: Total Completed: 257.50m Scope: 257.5m

13

NATM Tunnel (Benching)

Upline: Total Completed: 199.12m Scope: 199.12m

Downline: Total Completed: 200.20m Scope: 200.20m

SHC NATM PF: Total Completed: 257.5m Scope: 257.5m

14

NATM Tunnel (Secondary Lining)

Upline Invert: 199.12m completed out of 199.12m

Upline Overt: 199.12m completed out of 199.12m

Downline Invert: 200.0m completed out of 200.20m

Downline Overt: 200.2m completed out of 200.20m

SHC NATM PF Invert: Total Completed: 258m Scope: 257.50m

SHC NATM PF Overt: Total Completed: 73m Scope: 257.50m

MMRC

Recent News

mmrc
Mumbai 2025 : A city reborn
+31 Dec 2024
Mumbai's big infra leap
+31 Dec 2024
वांद्रे स्थानकातून मेट्रो स्थानक-बीकेसी बससेवा सुरू
+19 Dec 2024
दोन हजारांहून अधिक झाडांचे 'जिओ टॅगिंग' पूर्ण
+13 Dec 2024
आरे ते बीकेसीदरम्यान मुंबईच्या पोटातून सुसाट प्रवास !
+3 Dec 2024
जपानच्या उच्चाधिकाऱ्यांची बीकेसी मेट्रो स्थानकाला भेट
+02 Sep 2024
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

Maintained by Best IT Company in Ludhiana

  • mmrc
  • mmrc
  • mmrc
  • mmrc
Top