901 | Request for Proposal for “ Supply, Installation and Commissioning of Hardware/ related software for providing eOffice facility at MMRC and maintenance support for 6 months” | Pre-Bid Query Response | MMRDA/MMRC/439 | 26/02/2016 | file |
902 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Addendum No 2 | MM3-CBS-RS | 23/02/2016 | file |
903 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Addendum No 2 | MM3-CBS-RS | 23/02/2016 | file |
904 | Repair & Restoration of Thackersey building (G +3 Heritage II A structure) | RFP | MMRDA/MMRC/000444 | 20/02/2016 | file |
905 | Repair & Restoration of Thackersey building ( G +3 Heritage II A structure) | Notice | MMRDA/MMRC/000444 | 20/02/2016 | file |
906 | Repair & Restoration of Thackersey building (G +3 Heritage II A structure) | Notice | MMRDA/MMRC/000444 | 20/02/2016 | file |
907 | Repair & Restoration of Thackersey building (G +3 Heritage II A structure) | RFP | MMRDA/MMRC/000444 | 20/02/2016 | file |
908 | Invitation for Prequalification of bidders for Detailed Design, Engineering, Supply, Installation, Testing and Commissioning of Overhead Contact Syst em, Auxiliary Substations, 33 kV Cable Distribution Network, and Integration with other Systems : Package : 11A | Addendum No 1 | MM3-CBS-PST-002/2015 | 19/02/2016 | file |
909 | Invitation for Prequalification of bidders for Detailed Design, Engineering, Supply, Installation, Testing and Commissioning of Power Supply works inc luding Receiving Substations, 110 kV Cabling works, Traction Substations, Auxiliary Main Substations, Switching Stations, SCADA System, and Integration with other Systems : Package : 11B | Addendum No 1 | MM3-CBS-PST-001/2015 | 19/02/2016 | file |
910 | Invitation for Prequalification of bidders for Detailed Design, Engineering, Supply, Installation, Testing and Commissioning of Overhead Contact Syst em, Auxiliary Substations, 33 kV Cable Distribution Network, and Integration with other Systems : Package : 11A | Addendum No 1 | MM3-CBS-PST-002/2015 | 19/02/2016 | file |