101 | Architectural, Structural Design and Project Management Consultancy Services for the redevelopment of project affected buildings at Kalbadevi & Girgaon stations on Mumbai Metro Line 3. | Addendum No 1 | MMRC/Planning/PIU/KG3 | 21/06/2017 | file |
102 | Invitation for Pre-qualification of Applicants for Procurement of Part Design, Supply, Installation Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3.: Package-10A & 10B | Addendum No 1 | MM3-CBS-TWK | 21/06/2017 | file |
103 | RFP for Architectural, Structural Design and Project Management Consultancy Services for the redevelopment of project affected buildings at Kalbadevi & Girgaon stations on Mumbai Metro Line 3. | RFP | MMRC/Planning/PIU/KG3 | 07/06/2017 | file |
104 | Notice for Architectural, Structural Design and Project Management Consultancy Services for the redevelopment of project affected buildings at Kalbadevi & Girgaon stations on Mumbai Metro Line 3. | Notice | MMRC/Planning/PIU/KG3 | 07/06/2017 | file |
105 | Invitation for Prequalification of bidders for Procurement of Part Design, Supply, Installation, Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3. | PQ Document | MM3-CBS-TWK | 11/05/2017 | file |
106 | Invitation for Prequalification of bidders for Procurement of Part Design, Supply, Installation, Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3. | IFP Document | MM3-CBS-TWK | 11/05/2017 | file |
107 | Transport arrangements for shifting of PAPs in andheri(east) limit from MIDC to Chakala | Notice | MMRC/Pkg-7/Transport-MIDC/NIT/2 nd call/17 | 09/05/2017 | file |
108 | Transport arrangements for shifting of PAPs in Andheri (East) limit from MIDC to Chakala | Notice | MMRC/Pkg-7/Transport-MIDC/NIT/17 | 22/04/2017 | file |
109 | Construction of depot cum workshop buildings, metro station building, subway, earthwork and all associated works at Aarey colony for the Mumbai Metro Line-3 project | Notice | MMRDA/MMRC/000748 | 11/04/2017 | file |
110 | Providing of interior & balance civil works for MMRC's project office building at BKC | Notice | MMRC/Project Office/BKC/Interior &Balance Civil/NIT/2017 dt. 11/04/2017 | 11/04/2017 | file |