31 | Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) and Ballasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ). and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B. | Addendum - 2 and Bidders Queries Response | MM3-CBS-TWK-03 (PACKAGE 10C) | 23/08/2019 | file |
32 | Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) and Ballasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B. | Addendum No 1 | MM3-CBS-TWK-03 | 02/08/2019 | file |
33 | Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) and Ballasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ). and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B. | Notice | MM3-CBS-TWK-03 | 31/07/2019 | file |
34 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Mumbai Central (excluding) to Cuffe Parade (including) Stations. (Package: 15) | Bid Query Response | MM3-CBS-TVE (P2L1 & P2L2) | 06/02/2019 | file |
35 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Mumbai Central (excluding) to Cuffe Parade (including) Stations. (Package: 15) | Bid Query Response | MM3-CBS-TVE (P2L1 & P2L2) | 05/02/2019 | file |
36 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Mumbai Central (excluding) to Cuffe Parade (including) Stations. (Package: 15) | Addendum No 3 | MM3-CBS-TVE (P2L2) | 29/01/2019 | file |
37 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Mumbai Central (excluding) to Cuffe Parade (including) Stations. (Package: 15) | Addendum No 3 | MM3-CBS-TVE (P2L1) | 29/01/2019 | file |
38 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Mumbai Central (excluding) to Cuffe Parade (including) Stations. (Package: 15) | Bid Query Response | MM3-CBS-TVE (P2L1 & P2L2) | 16/01/2019 | file |
39 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Mumbai Central (excluding) to Cuffe Parade (including) Stations. (Package: 15) | Addendum No 2 | MM3-CBS-TVE (P2L2) | 16/01/2019 | file |
40 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Mumbai Central (excluding) to Cuffe Parade (including) Stations. (Package: 15) | Addendum No 2 | MM3-CBS-TVE (P2L1) | 16/01/2019 | file |